Who will build the network and when will it be available?

FirstNet is charged with overseeing the construction of the network. FirstNet possesses the license to the 20 MHz of radio spectrum that has been dedicated to the network, and FirstNet owns the network core. The radio access network (RAN) portion of the network – consisting of all of the communication sites (e.g., towers) and the radio and data transportation components associated with them – will be built by FirstNet. All 50 states, five U.S. territories and Washington, D.C. have “opted in” to FirstNet, meaning each has accepted its individual State Plan detailing how the network will be deployed in their state/territory. FirstNet has until 2022 to build out the network.